Chula Vista ADU requirements
Chula Vista is one of the friendlier cities in San Diego County for ADUs. There's no parking requirement, no rule that your ADU must match your house, and a set of City Standard plans that move through review faster. Chula Vista repealed its local ADU and JADU code sections in 2025 and defers to state law, and the city lays out how it applies on its City of Chula Vista ADU page. Here's the full picture in plain language.

How many units on a single-family lot
| Detached new-construction ADU | One |
|---|---|
| Converted or attached ADU | One (converted or attached, not both) |
| Junior ADU (JADU) | One |
So a lot could have the house, a backyard ADU, an attached or garage ADU and a JADU.
Size, height and setbacks
| Detached | Converted or attached | JADU | |
|---|---|---|---|
| Max size | 1,200 sq ft | 50% of the house or 800 sq ft, whichever is greater | 500 sq ft |
| Max height | 16 ft (more than half a mile from transit); 18 ft within half a mile of transit; 20 ft to match roof pitch where 18 applies | Attached: 25 ft or the house's max, whichever is less. Converted: no max | Inside the house |
| Setbacks | 4 ft side and rear. Front yard only if an 800 sq ft ADU can't fit otherwise | ||
| Separation | None required (check fire-rated walls with Building) | ||
More detail: height, size and setbacks.
What's not required
- Parking. None.
- Design matching. None.
- Owner occupancy for an ADU. None. (JADUs need it.)
- Sprinklers. Only if the house requires them.
Multifamily lots
Up to 8 detached ADUs, not more than the existing unit count, plus conversions up to 25% of units. See multifamily ADUs.
Utilities
An ADU may share the house's water and sewer laterals. A separate electric meter and a separate address are possible. See utilities.
Fees
- DIF: ADUs under 750 sq ft and JADUs are exempt; 750 sq ft and up are charged proportionately to the house.
- Rates are indexed every October 1. The city estimates DIF during plan check, and most can be deferred to final inspection (not the Traffic Signal fee).
- School fees: Sweetwater Union HSD and Chula Vista Elementary SD.
See cost and fees.
City Standard plans
12 options in six sizes from 498 to 1,199 sq ft, reviewed in 14 business days instead of 21, with about $1,000 less in plan review fees. See City Standard plans.
Guest houses are different
A guest house can't have a kitchen, can't be rented and limits stays to 90 days. See ADU vs. guest house.
The city's ADU loan program
The city's ADU loan program has been closed to applications since June 2024, with an interest list. See financing.
Timelines under state law
Under Gov. Code §66317, the city must confirm completeness within 15 business days and approve or deny a complete application within 60 days when there's an existing home on the lot.
Where Chula Vista's ADU rules live now
Chula Vista no longer has its own ADU or JADU code sections. Ordinance 3592, adopted April 15, 2025, repealed former CVMC 19.58.022 (ADUs) and 19.58.023 (JADUs). The ordinance says the city did this after SB 1211 took effect on January 1, 2025, and that deferring all ADU and JADU regulation to the state Government Code keeps local rules in compliance as state law changes. It took effect 30 days after final passage.
In practice, state law (Gov. Code §§66314 to 66342) governs, and the city's ADU page explains how Chula Vista applies it: plan check, fees, City Standard plans and utility arrangements. If you find an older document citing 19.58.022, treat it as out of date.
Also checked Oct 14, 2026: Chula Vista Ordinance 3592 (April 15, 2025).
Sources, checked Oct 14, 2026: City of Chula Vista ADU page · Gov. Code §66317.